A large landing ship “Vladimir Andreev” was launched

BMPD – The ceremony of simultaneous laying for the Russian Navy of two large landing ships of the modified project 11711 “Vladimir Andreev” (factory number 303) and “Vasily Trushin” (factory number 304) took place at the PSZ “Yantar” in Kaliningrad on April 23, 2019, but their construction, as usual, turned into a long-term construction. Initially, the delivery of the new BDK “Vladimir Andreev” and “Vasily Trushin” was scheduled for 2023 and 2024. During the descent of the lead ship, it was announced that 2026 is now considered to be the term of commissioning of the lead ship.

(In Russian)

(Thanks to Alain)