US Navy zeroed in on LCS flawed parts, maintenance slow-downs to improve operational days

Defense News – The U.S. Navy hopes to boost the number of days the littoral combat ship is operational by targeting the drivers of down time: design flaws in 32 parts that need to be replaced and a sluggish contractor-based maintenance model that needs to be made more responsive.